로고

Product

Darmatt KM-1

KM-1 NUCLEAR GRADE FIREWALL SYSTEM

  • · Up to 4 Hour Fire Protection
  • · Tested ASTM E119-05 which is larger structure fire test
  • · Lightweight & compact
  • · Wall, Partition, ceiling & duct solution
  • · Total or partial removability for plant maintenance
  • · Hose stream test ASTM-E2226-11
  • · Can be installed to existing wall or other structures / Load calculation and seismic analysis report

CERTIFICATION TESTING

  • · Tests have been carried out at both the Favorable Technology Centre, a NAMAS accredited, internationally recognized fire testing laboratory, our in-house UKAS approved test facility, and independent test facilities in the USA, such as Omega Point and Wyle Laboratories.
  • · KM-1 system has passed 1 and 3 hour fire tests in a wide range of boundary and site specific configurations.
  • · Fire tests have been UL witnessed and comply with the criteria of: US NRC generic letter 86-10, supplement 1, UL 1724 & ASTM E119.
  • · UL Observation and Certification
  • DARMATT KM1™ FIRE BARRIER SYSTEM FOR NUCLEAR INSTALLATIONS

    • · The system is based on a patented semi-rigid board, made of ceramic fiber sheets containing a strongly endothermic material which absorbs heat during a fire, creating an effective delay to the heat transfer mechanism.
    • · The system is designed for ease of installation and for future removal and replacement, hence avoids contaminated refuses resulting from removal of not reusable materials.
    • · Site installation is carried out using a kit of parts that are custom fabricated from site survey.
    • · The installed system is durable, weather proof and aesthetically appealing.
  • FIRE BARRIER SYSTEM FOR NUCLEAR

    • · Strong project management and compliance with international quality standards for nuclear.
    • · Develop an extensive capability to solve customer problems through engineering, development, testing, installation and manufacturing.
    • · Specialize in the design, development and supply of fire barrier systems for primary circuit equipment with contracts on over 100 nuclear reactors.
    • · Engaged in the fire protection of cable trays and electrical equipment associated with emergency shutdown systems.
    • · Capability for comprehensive engineering and test services.
  • KM-1 Domestic Construction

    • · Delivery and construction of fire protection systems for domestic nuclear power plants including Gori Units 1-2, Hanbit Units 1-2, Hanbit Units 5-6, Uljin Units 1-2, and Shin Kori Units 1-2
    • · Particularly, Gori Unit 1, a significant project granted domestic initial long-term operation permit by Korea Hydro & Nuclear Power Co., involves our company in the production, supply, SITE engineering, and construction related to fire protection system enhancement.